<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xml:base="http://renovatedsm.com" xmlns:dc="http://purl.org/dc/elements/1.1/">
<channel>
 <title>RenovateDSM.com - Building a Deck - Process Overview - Comments</title>
 <link>http://renovatedsm.com/node/99</link>
 <description>Comments for &quot;Building a Deck - Process Overview&quot;</description>
 <language>en</language>
<item>
 <title>Building a Deck - Process Overview</title>
 <link>http://renovatedsm.com/node/99</link>
 <description>&lt;p&gt;The procedure for building a deck is roughly as follows:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;&lt;b&gt;Drawings and Permit&lt;/b&gt;&lt;/p&gt;
&lt;li&gt;&lt;b&gt;Lists&lt;/b&gt; - Make lists of the materials you will need (add in about 10%-15% for waste) and the tools you will need.
&lt;li&gt;&lt;b&gt;Rough Layout&lt;/b&gt; - Block out the approximate shape of your deck using 2x4&#039;s or string and stakes.
&lt;li&gt;&lt;b&gt;Dig Footings&lt;/b&gt; - In Des Moines, footings must be a minimum of 36&quot; deep to get below the frost line.
&lt;li&gt;&lt;b&gt;Hole Inspection&lt;/b&gt; - The building inspector may need to stop by to measure the depth of the holes before you pour any concrete.&lt;br /&gt;
&lt;p&gt;&lt;a href=&quot;http://renovatedsm.com/node/99&quot;&gt;read more&lt;/a&gt;&lt;/p&gt;</description>
 <comments>http://renovatedsm.com/node/99#comments</comments>
 <category domain="http://renovatedsm.com/taxonomy/term/20">Exterior</category>
 <category domain="http://renovatedsm.com/taxonomy/term/5">How To</category>
 <pubDate>Thu, 23 Aug 2007 20:35:54 -0700</pubDate>
 <dc:creator>RenovateDSM</dc:creator>
 <guid isPermaLink="false">99 at http://renovatedsm.com</guid>
</item>
</channel>
</rss>
